Three-year life safety construction project underway at PCAC

Improving the fire systems was a major priority for the building constructed in 1960.

By: Meredith Hohnbaum

Outlets: The New Hampshire

Published: December 18, 2025

Words: 1,531

Last Updated: 1 month, 1 week ago


Body Text Preview

DURHAM- Students and faculty walking into the Paul Creative Arts Center (PCAC) this semester are greeted by loud drilling, bright red “DANGER: CONSTRUCTION AREA” signs plastered on the scene shop door, and metal gates outside fencing off the Johnson Theatre.

The PCAC at …

Create a free account to access this story and more

Join Plucky Wire to access full stories, collaborate with newsrooms, and discover content from networks around the world.

Register for Free Log in

© 2025 Plucky Works LLC